Cooling towers are an integral piece of equipment for many processes, from power generation to food processing. Such systems which utilize fans to create draft (both forced and induced) can use a substantial amount of power, representing higher operating costs or decreased operating efficiency.
Opportunity – Minimize Power Usage & Maximize Cooling Effect
Although on the surface, cooling towers may appear simple with little opportunity for performance changes beyond a rebuild, this is not the case. Ambient conditions (e.g., temperature, humidity, wind speed and direction, etc.) have a dramatic effect on the system’s behavior, and can even affect efficiencies from cell to cell. Compound this with variable cooling demands caused by changing process conditions, and there are many interactions that need to be accounted for in cooling system operation. Intelligent systems can learn to understand these multiple factors and their influence, thereby identifying how to adapt to these to keep the system operating as efficiently as possible.

Taber’s Cooling Tower Optimization application (CTopt) can reduce power consumption while achieving similar or even improved process performance. Intelligently balancing tower power demand and active tower cells with cooling demand and outlet temperatures ensures that process cooling needs are met at the lowest achievable cost. CTopt has demonstrated power consumption reductions of 5-10% while maintaining outlet temperatures through intelligent control of individual fan speeds. The system is also effective in prioritizing cell activation and deactivation orders when only on/off control ability is available so that the most cost-effective cells are always operating and are transitioned at the most optimal time.
Installation of Griffin Open Systems’ AI platform and Taber’s CTopt application is quick and simple, requiring less than one week after internal control system changes are in place. Necessary I/O points are minimal, needing less than 50 I/O points depending on system size and scope. After a short AI learning and exploratory period (typically 2 – 3 weeks), benefits of the optimization system can be expected to be seen within one month of install.
Maximize the performance of your cooling towers by contacting us today!